[Zhongbo.com] (1) On the basis of the acceptance of the steel structure at the bottom of the pool, according to the kiln construction reference line and the kiln center line, the relevant feeding port, the front and rear rows of bubbling and the drawing and draining plates on the forming path are released. Center line.

(2) The bottom of the pool, including the bottom of the passage. After the insulation bricks and kaolin bricks are built, the temperature is 30-50mm inside and outside the wall of the masonry wall. The multi-layered ground structure must be controlled according to the negative deviation of the elevation during the masonry construction, and the allowable deviation of the total thickness of the bottom of the pool is generally -3 mm. A layer of chrome ramming material is applied as a sealing layer on the bottom of the bottom kaolin brick to prevent the glass from penetrating into the clay brick layer with poor corrosion resistance.

(3) Wall construction, including access pool walls. The bottom brick of the brick wall must be level, otherwise the bottom brick of the part should be processed until it meets the requirements. When multi-storey wall bricks are built, first and then the outside is operated. To ensure the size of the furnace, it is strictly forbidden to cut the surface of the brick towards the furnace. The corners need to be staggered and sewed to maintain the verticality.

(4) Lifting the column. Temporary measures are taken to stabilize the column, and then the angle steel is installed according to the design requirements. The column and the angle steel must be close to each other and the elevation is fixed.

1.jpg

(5) Masonry building. After the abortion is made, after the arching is subjected to the bearing settlement test and the corresponding dimensional inspection, the large concrete is simultaneously laid to the center from both sides, and continuous operation is required, and the construction of the large insulation layer is to be carried out after the completion of the baking kiln.

(6) Masonry chest wall, front wall, back wall and passage flame space. Masonry of the chest wall should be carried out after careful inspection of the brackets, pallets and support brackets. Masonry hook bricks and chest wall bricks should have measures to prevent dumping into the kiln.

(7) Masonry chimneys and chimneys. The kiln must be removed and cleaned with a vacuum cleaner for masonry. The masonry of the furnace flue and the chimney must be matched with the metal heat exchanger, and the passage chimney must be built after the passage is completed.

(8) The masonry method is divided into dry and wet construction.

Drying parts: the bottom of the melting section and the passage, the wall of the pool, the hook bricks in the flame space, the bricks in the melting section and the flue, the fused brick masonry and the passage roof brick.

Wet masonry parts: side walls and domes of the flame space of the melting part, insulation bricks of the flue, chimney and kiln. The mud used for the wet building should be prepared according to the refractory brick used.

Terry Towel Slipper

With firm commitment to quality, we are manufacturing, supplying and trading a comprehensive range of Terry Slipper Manufacturer. The offered spectrum of slippers has supple suede construction features a mock-stitched toe. The terry cloth lining and memory foam insole deliver soft support, while the rubber out sole is substantial enough for outdoor use.Our range of Terry Slippers is widely appreciated by our clients which are situated all round the nation. We offer our range of Terry Slippers at most affordable prices.

Towel Slippers,Cotton Terry Slipper,Terry Slippers,Hotel Terry Slipper

Yangzhou Lansun Slipper Co.,Ltd , https://www.lansunslippers.com